Projects

Engineering

2014-03, Eastside Street Reconstruction

Wednesday, December 04, 2013

The project includes removals, grading, aggregate base, concrete curb and gutter, bituminous surfacing, sanitary sewer and services, watermain and services, storm sewer, drain tiling, concrete sidewalk, and related improvements. The streets proposed to be included are: Brand Ave from Division St. E. to 5th St. SE; Division St E. from Shumway Ave to 600 feet east of Brand Ave.; Erblang Ave from TH 60/1st St. NE to St. Paul Ave.; 2nd St. N.E. from 3rd Ave. N.E. to west end; 3rd Ave. N.E. from 3rd St. N.E. to TH 60/1st St N.E.; 5th Ave. N.E. from Division St. E. to TH 60/1st St. N.E.

Status

Under Construction

For More Information

Engineering Department

Awarded

Heselton Construction

Amount

$1,918,420.81

Public Meetings

There are no meetings associated with this project.

Web Development by Livefront, a Minneapolis Web Design firm.